Assembly hall with office wing
The project involved erecting a new steel framework assembly building with an office wing from prefab concrete elements and a useful area of 10,600 m2 (over 114,000 sq. ft.) respectively with a gross volume of 111,000 m3 (almost 4 million cu. ft.). We were commissioned to perform all architectural work such as planning, invitations to tender and construction management. This ensured that the customer’s quality criteria were fulfilled.
The project involved erecting a new steel framework assembly building with an office wing from prefab concrete elements and a useful area of 10,600 m2 (over 114,000 sq. ft.) respectively with a gross volume of 111,000 m3 (almost 4 million cu. ft.). We were commissioned to perform all architectural work such as planning, invitations to tender and construction management. This ensured that the customer’s quality criteria were fulfilled.