Clean room modernization (pharmaceuticals)

Installation of a new 2,000 sq. m (21,528 sq. ft.) accessible acoustical clean room ceiling above pill manufacturing lines - during production operations. To protect the production lines below, a pressure-tight, temporary steel-frame intermediate deck with structural steel decking was installed as a work surface for putting in the new HVAC system and clean room ceiling above.